114.908 vacatures

18 sep 2024

Master's thesis in Data Science & AI: Explainable infrastructure design for effective and efficient energy usage

Branche Zie onder
Dienstverband Zie onder
Uren Zie onder
Locatie Veenendaal
Salarisindicaties 0-5.000
Opleidingsniveau Zie onder
Organisatie Info Support
Contactpersoon Info Support Nederland
0318552020

Informatie

This thesis explores using explainable AI to identify optimal locations for new power grid infrastructure in the Netherlands. With the rise in renewable energy sources, the goal is to develop a model that provides valuable insights and addresses grid expansion challenges. Required interest(s)
  • XAI
  • Sustainable Energy
  • Geo-Data
What do you get
  • A challenging assignment within a practical environment
  • € 1000 compensation, € 500 + lease car or € 600 + living space
  • Professional guidance
  • Courses aimed at your graduation period
  • Support from our academic Research center at your disposal
  • Two vacation days per month
What you will do
  • 65% Research
  • 10% Analyze, design, realize
  • 25% Documentation

Omschrijving

This thesis explores using explainable AI to identify optimal locations for new power grid infrastructure in the Netherlands. With the rise in renewable energy sources, the goal is to develop a model that provides valuable insights and addresses grid expansion challenges. Required interest(s)
  • XAI
  • Sustainable Energy
  • Geo-Data
What do you get
  • A challenging assignment within a practical environment
  • € 1000 compensation, € 500 + lease car or € 600 + living space
  • Professional guidance
  • Courses aimed at your graduation period
  • Support from our academic Research center at your disposal
  • Two vacation days per month
What you will do
  • 65% Research
  • 10% Analyze, design, realize
  • 25% Documentation

Functie eisen

In 2022, the collective solar panel capacity installed on residential roofs grew by over 30% compared to the previous year. Additionally, there was a significant increase in the use of charging stations and heat pumps throughout the Netherlands. While this progress is great news for the transition towards renewable energy and European climate objectives, it also puts considerable (peak) pressure on the power grid. Grid operators have responded by increasing capacity through laying new cables and erecting hundreds of additional transformer houses. However, determining the optimal locations for new infrastructure can be challenging due to existing infrastructure, available space, and other factors.

Solliciteer direct